Saturday, September 12, 2009


2009-09-12:

The track is now painted on both sections.
The masonite is attached aswell.
Will halt the work on this module until after the module meeting at the end of this month.

Wednesday, September 9, 2009

2009-09-09:
After a little break in the work with the module, I continued today by cutting the large pieces of masonite that will be aligned along the track. Some smaller pieces will be needed aswell, but those will be meassured and cut after the large ones are in place.
Before attaching the masonite, the tracksides needed to be painted, so that was done aswell