Tuesday, October 26, 2010

More buildings

2010-10-26:

Long time since posting.
Here is a pic of a new building for the second half of Mainstreet.

Mainstreet att DreamTrack 2010

2010-03-19:
Here is a short clip with Mainstreet (one half) at DreamTrack 2010.

http://www.youtube.com/watch?v=fuoi7AXExl0

Wednesday, January 27, 2010




2010-01-27:
Two more buildings done. Some signs might be added later thought.




Monday, January 25, 2010



2010-01-25:
Made a new baseboard for the car salesman. The original baseboard to the left was way to thick.
The sign on the office need to updated to an american sign thought.

Sunday, January 17, 2010








2010-01-17:

Secetion 1 and 2 done with new strip in the center of the track made from styren.

Both sections tested and works fine.

Did a little testsetup to se how things might will look in the feature.

Sunday, January 3, 2010




2010-01-03:
The plaster is painted and some of the balsa was glued in the center of the track.
When I tested with a loco, it got stuck on the balsa, so I need to replace that with some thinner material. 0.75 mm styren will probably work fine. As I have to order that, the work has to halt for now.

Saturday, January 2, 2010


2010-01-02:
Added plaster to the outside of the track to simulating concrete blocks around the tracks in the street.
Painted the white masonite gray up to the edge of masking tape on the track.
Will do the other side when the first side is dry.